Mt. Stuart Elementary Construction
Project Information
Location: 1701 North Cora Street
Square Footage: 55,993 sq. ft.
Classrooms: 21 classrooms K-5 with classrooms for learning specialists
Student Capacity: Approximately 500 students
Funding Source: 2018 Capital Bond Project
Architect: Integrus Architecture
Construction Management: OAC Services, Inc.
Contractor: Garco Construction
Anticipated Completion: Fall, 2021
Project Overview
The original 34,100 square foot building was built in 1967 and a 6,730 square foot gymnasium was added on in 1993. The plan is to construct a new approximately 500 student, 55,000 square foot K-5 school on an existing Mt. Stuart site. The new school consists of new general classrooms, special education/resource rooms, library, kitchen, gymnasium, commons, music room to accommodate band/choir program, administrative, counseling and educational support spaces. Once completed, students/staff and resources will occupy the new school and the existing structure will be abated and demolished. Final site and playground landscaping would be completed in this phase.
Walk Through
Mt. Stuart Elementary School Project Plan
The original 34,100 square foot building was constructed in 1967 and has had several modifications since. A 4,001 square foot annex was added in 1972, and a 6,730 square foot gymnasium was added in 1993. The original construction was funded in part by a grant from the Washington State Recreation and Conservation Office. Conditions of this grant include maintaining 18 acres of conservation land for recreation purposes. This land may be maintained on the site or moved to the adjacent new elementary site.
The new Mt. Stuart project is proposed as an approximately 500 student, 56,000 square foot K-5 school on the existing Mt. Stuart site. The new school would contain general classrooms, special education/resource rooms, library, kitchen, gymnasium, commons, music room to accommodate the music, and orchestra program, administrative, counseling, and educational support spaces. Once the new Mt. Stuart is complete, students and staff will move to their new facility and the existing structure will be abated and demolished. After students and staff move into the new building, final site and playground landscaping will be completed, approximately in the location of the existing school.
New Elementary Schools
- Build a new approximately 500-student elementary school on District-owned property near Mt. Stuart Elementary
- Build a new-in-lieu approximately 500-student Mt. Stuart Elementary school on existing Mt. Stuart Elementary property
- Seek continual feedback from the community on the school's design throughout the planning phase
Expansion & Renovation
- Eliminate the use of portable buildings, regaining learning time lost during transitions and improving security
Maintenance & Safety
- Address maintenance and safety concerns at Mt. Stuart and Lincoln Elementaries, including parking and traffic improvements, secure entrances, and HVAC upgrades
- Construction Progress
- Design Journey
- Programs
- RCO Land
- New-in-Lieu of Modernization
- General Contractor/Construction Manager (GC/CM)
Construction Progress
Construction Progress — Drone Photos
April, 2020
Looking south at the field where the replacement Mt. Stuart Elementary will be located to the north of the existing Mt. Stuart campus.
April, 2020
The annex to the west of Mt. Stuart Elementary and the portable south of the annex will be remodeled and become the Early Learning Center.
April, 2020
View of a portion of the awning and brick wall on the north side of Mt. Stuart Elementary removed in preparation for the replacement school.
April, 2020
The field located to the north will be the home of the replacement school beginning at the north edge of the existing building to just north of the fence line.
April, 2020
Located to the west of Mt. Stuart Elementary are the annex and portable buildings. The annex and the portable to the south will be remodeled and become the Early Learning Center.
April, 2020
Looking south across the Palouse to Cascades Trail from the north property toward Mt. Stuart Elementary and the Nature Park.
July, 2020
Looking north at the construction progress of the replacement Mt. Stuart Elementary school. Three of the four wings of the school building have various stages of foundations completed.
July, 2020
View looking northeast at the construction progress of the replacement Mt. Stuart Elementary school. Three of the four wings of the school building have various stages of foundations completed.
July, 2020
South of the Palouse to Cascades Trail is the location of the replacement Mt. Stuart Elementary; the new elementary is to be located north of the Trail.
July, 2020
View looking from north to south at the replacement Mt. Stuart Elementary construction site to the north of the existing Mt. Stuart Elementary building.
August, 2020
View of the foundation footings and stem walls at the replacement Mt. Stuart Elementary construction site to the north of the existing Mt. Stuart Elementary building.
August, 2020
View of the replacement Mt. Stuart Elementary construction site to the north of the existing Mt. Stuart Elementary building.
August, 2020
View looking south at the replacement Mt. Stuart Elementary construction site located north of the existing Mt. Stuart Elementary building.
August, 2020
View from the southwest toward the northeast at the replacement Mt. Stuart Elementary construction site located to the north of the existing Mt. Stuart Elementary building.
August, 2020
View from the south viewing north at the replacement Mt. Stuart Elementary construction site located to the north of the existing Mt. Stuart Elementary building.
October, 2020
View from the northeast looking southwest at the replacement Mt. Stuart Elementary. More than half of the pan decking, the first layer of the roof, has been installed.
October, 2020
View from the northeast looking southwest at the replacement Mt. Stuart Elementary. More than half of the pan decking, the first layer of the roof, has been installed.
October, 2020
View from the north looking south at the replacement Mt. Stuart Elementary. More than half of the pan decking, the first layer of the roof, has been installed.
October, 2020
View from the north looking south at the replacement Mt. Stuart Elementary. More than half of the pan decking, the first layer of the roof, has been installed.
October, 2020
View from the east looking west at the replacement Mt. Stuart Elementary. Structural steel nears completion and framework of the walls is underway.
October, 2020
View from the east looking west. The gym is to the left, administration is directly in the center, and the courtyard is behind the front wing of the replacement Mt. Stuart Elementary.
October, 2020
View from the west looking northeast. The structural steel erection nears completion at the replacement Mt. Stuart Elementary.
October, 2020
View from the west looking northeast. The structural steel erection nears completion at the replacement Mt. Stuart Elementary.
October, 2020
View from the west looking east. The structural steel erection nears completion at the replacement Mt. Stuart Elementary.
October, 2020
View from the west looking northeast. The structural steel erection nears completion at the replacement Mt. Stuart Elementary.
October, 2020
View from the north, across the Palouse to Cascades Trail looking south at the replacement Mt. Stuart Elementary.
October, 2020
View from the north looking south at the replacement Mt. Stuart Elementary located to the north of the existing elementary building.
October, 2020
View of the west side of the gym and kitchen at the replacement Mt. Stuart Elementary.
October, 2020
View from the southwest of the replacement Mt. Stuart Elementary. The main entrance faces Cora Street.
October, 2020
View of the interior courtyard from the southwest. Located to the southeast of the building is the gym and kitchen, in the center of the east side is the front entrance.
October, 2020
View from the west looking east toward Cora Street of the replacement Mt. Stuart Elementary.
October, 2020
View from the northeast with the existing Mt. Stuart Elementary and future Early Learning Center in the background.
October, 2020
View of the north side at the replacement Mt. Stuart Elementary.
October, 2020
View of the north side with the existing Mt. Stuart Elementary and future Early Learning Center in the background.
October, 2020
View of the east side of the gym and front entrance at the replacement Mt. Stuart Elementary.
October, 2020
View of the replacement Mt. Stuart Elementary from the new elementary school building site with the existing Mt. Stuart Elementary in the background of the replacement school.
December, 2020
View of the replacement Mt. Stuart Elementary from the southeast.
December, 2020
View from the north with the existing Mt. Stuart Elementary in the background.
December, 2020
View from the northeast with the existing Mt. Stuart Elementary and Nature Park in the background.
December, 2020
View from the east at the gym and front entrance area with the Nature Park in the background.
December, 2020
View from the east at the front entrance of the replacement Mt. Stuart Elementary with the Nature Park in the background.
December, 2020
View from the new elementary school property, north of the Palouse to Cascade Trail, south to the replacement Mt. Stuart Elementary with the existing Mt. Stueart Elementary in the background.
January, 2021
View of Mt. Stuart Elementary from the north. The existing Mt. Stuart Elementary is to the south of the replacement school and the Nature Park is to the west.
January, 2021
View from the southwest.
January, 2021
View from the northeast at the main entrance, located facing Cora Street.
January, 2021
View from the east at the gym, main entrance and kindergarten areas.
January, 2021
View from the south at the gym and kitchen
April, 2021
View from the west. The front entrance and parking lot are at the top of the photo.
April, 2021
View from north of the Palouse to Cascades Trail. The existing Mt. Stuart Elementary is in the background, construction laydown area is in the foreground.
April, 2021
View from the northeast. The front entrance and parking lot are on the left.
April, 2021
View from the north with the existing Mt. Stuart in the background.
April, 2021
View from the east/front.
April, 2021
View of the south wint with the gym and kitchen area to the right. To the bottom of the photo is where the playground will be located.
April, 2021
View from the west. A pathway will lead directly from the building to the Nature Park located just to the left.
Major Milestone!!
Last Structural Steel Piece Placed!
Ribbon Cutting!
- April - June, 2020
- July - September, 2020
- October - December, 2020
- January - March, 2021
- April - June, 2021
- July - September, 2021
- November - December, 2021
April - June, 2020
Construction Progress — April & May, 2020
Looking west at the removal of the awning located on the north side of the existing Mt. Stuart Elementary.
Looking south at the removed awning located on the north side of the existing Mt. Stuart Elementary.
Looking east at play equipment being moved from the north side of Mt. Stuart Elementary to the south side.
Looking southeast at the removal of blacktop at the north side of the existing Mt. Stuart Elementary.
Looking east at the removal of blacktop located to the north of the existing Mt. Stuart Elementary.
Looking at equipment removing blacktop located to the north of Mt. Stuart Elementary.
Looking west at the removal of trees along blacktop to the north of Mt. Stuart Elementary.
Looking west at the clearing located to the northwest of the existing Mt. Stuart Elementary.
Looking west at equipment leveling land on the northwest side of the existing Mt. Stuart Elementary.
Looking northwest toward the Nature Park at equipment leveling land.
Looking north at equipment leveling land.
Looking west at equipment leveling land and digging utility trenches.
Looking west at leveling of land located between the portables of Mt. Stuart Elementary and the Nature Park.
Looking west at prepping of land alongside the Nature Park.
Looking west toward the Nature Park land prepared for geo pier installation and foundation footings.
Looking southwest at equipment leveling the land and prepping the site.
Looking south at equipment leveling land in preparation for geo pier installation and foundation footings.
Looking northwest at equipment leveling land in preparation of geo pier installation and foundation footings.
Looking east toward Cora Street at equipment leveling land.
Looking east toward Cora Street at the leveling of land.
Looking east at equipment leveling land in preparation for geo pier installation and foundation footings.
Looking east at equipment leveling land.
Looking south at equipment used for leveling the land in preparation of geo pier installation and foundation footings.
Looking west at equipment used in leveling of the land.
Construction Progress — June, 2020
Looking northwest toward the Nature Park at equipment leveling land in preparation of geo pier installation and foundation footings.
Looking northwest at equipment leveling land alongside the Nature Park.
Looking northwest toward the Nature Park at land prepped for geo pier installation and foundation footings.
Looking southeast toward the existing Mt. Stuart Elementary at equipment leveling the land in preparation of geo pier installation and foundation footings.
Looking northeast toward Cora Street at land prepped for geo pier installation and foundation footings.
Looking south along Cora Street at equipment leveling of land.
Looking southeast toward Cora Street at equipment prepping land for utility installation.
Looking southeast toward Cora Street at equipment digging trenches for utility installation.
Looking southeast along Cora Street at equipment digging trenches for utility installation.
Looking east toward Cora Street at trenches for utilities.
Looking east toward Cora Street at equipment digging trenches for utility installation.
Looking south toward the north side of the existing Mt. Stuart Elementary building at a trench dug for utilities.
Looking east toward Cora Street at trenches for utility installation.
Looking southwest toward the Mt. Stuart Elementary portables at utility trenches.
Looking southwest toward Mt. Stuart Elementary portables at markers for geo pier installation.
Looking southeast toward the existing Mt. Stuart Elementary parking lot at a trench for utilities.
Looking north at a trench for utilities located between the existing Mt. Stuart Elementary and the portables.
Looking southeast toward the Mt. Stuart Elementary parking lot and front lawn at a trench for utilities located between the existing Mt. Stuart Elementary and portables.
Looking northwest toward the Nature Park at equipment digging utility trenches.
Looking east toward Cora Street at markers for geo pier installation and a utility trench.
Looking west at utility trench.
Looking south at a utility trench located between the existing Mt. Stuart Elementary and the portables.
Looking north toward the Nature Park at utility trench.
Equipment used for geo pier installation.
Equipment preparing to drill for geo pier installation.
Equipment drilling for geo pier installation.
Equipment installing geo piers.
Looking west at utility conduit in trench.
Looking west at a trench covered over after utility installation.
Looking south at utility conduit in trench.
Looking east along the north side of the existing Mt. Stuart Elementary at utility conduit in a trench.
Looking southeast toward the Mt. Stuart Elementary gym at utility conduit in a trench.
Looking southwest at equipment preparing ground for foundation installation.
Equipment used for the installation of geo piers.
Looking south at land after the conclusion of geo pier installation and trenches covered over. Markings are for the trenching to be completed in preparation of foundation framing and footings.
Looking southeast toward the Mt. Stuart Elementary gym at the land after the utility trenches have been covered.
Looking north at equipment digging a trench for the installation of foundation forms.
Looking south at trenches dug for the installation of foundation footings.
Looking southeast at trenches dug for the installation of foundation footings.
Looking east at a trench dug for the installation of forms used when pouring foundation footings.
Looking south at crews constructing foundation forms.
Looking south at crews preparing to construct foundation forms.
Looking southwest at foundation forms.
Foundation forms
Looking south at equipment digging trenches for the installation of foundation forms.
Crews constructing foundation forms in preparation for pouring of the foundation.
Crews constructing foundation forms in preparation for pouring of the foundation.
Looking west at foundation forms.
Looking south at crews constructing foundation forms.
Installation of reinforcing steel within foundation forms.
Looking south at steel lined alongside crews constructing foundation forms.
Looking south at crews constructing foundation forms for the first phase of the Mt. Stuart Elementary replacement school.
Looking southeast at forms constructed for the installation of the foundation.
Looking south at foundation forms constructed for the installation of the foundation at Mt. Stuart Elementary replacement school.
Looking south at crews constructing foundation forms.
Crews constructing foundation forms and digging trenches in preparation for additional foundation forms.
Looking south at crews constructing foundation forms and digging trenches for additional foundation forms.
July - September, 2020
Construction Progress — July, 2020
View from the north at crews constructing foundation forms at the replacement Mt. Stuart Elementary.
View from the north at crews constructing foundation forms.
View from the north at the construction of foundation forms.
View from the north at crews laying utilities.
Looking to the southwest at a trench dug for the construction of foundation forms.
Looking southwest at utilities laid within a trench.
Looking southwest at trenches for the construction foundation forms at the replacement Mt. Stuart Elementary.
View from the north at crews pouring concrete into the foundation forms constructed at the replacement Mt. Stuart Elementary.
Looking northwest at crews pouring and troweling foundation forms at the replacement Mt. Stuart Elementary.
View from the north at crews constructing foundation forms at the replacement Mt. Stuart Elementary.
View from the north at foundation forms.
View from the north at foundation forms at the replacement Mt. Stuart Elementary.
Foundation forms at the replacement Mt. Stuart Elementary.
Looking north at a crew member constructing foundation forms at the replacement Mt. Stuart Elementary.
View from the north at foundation forms at the replacement Mt. Stuart Elementary.
Looking southwest at crews constructing foundation forms at the replacement Mt. Stuart Elementary.
Looking north at the end of Cora Street where it meets the Palouse to Cascade Trail at crews beginning the process of clearing vegetation.
Looking north at the end of Cora Street where it meets the Palouse to Cascade Trail at crews beginning the process of clearing vegetation.
Looking north at the end of Cora Street where it meets the Palouse to Cascade Trail at cleared vegetation on either side of the trail.
Looking north at plumbing at the replacement Mt. Stuart Elementary.
Looking northwest toward the Nature Park at crews constructing foundation forms at the replacement Mt. Stuart Elementary.
Looking southwest at crews constructing foundation stem walls at the replacement Mt. Stuart Elementary.
Looking west at foundation forms and plumbing.
Looking north at foundation forms and the construction of stem walls at the replacement Mt. Stuart Elementary.
Looking northwest toward the Nature Park at the construction foundation stem walls.
Looking northeast at the construction of foundation stem walls.
Looking north at the end of Cora Street where it meets the Palouse to Cascade Trail at crews clearing vegetation and raising the grade from Cora Street to the trail.
Looking southeast at the replacement Mt. Stuart Elementary construction site at crews constructing foundation footings and stem walls, plumbers installing plumbing and electricians laying electrical circuitry.
Looking south at the replacement Mt. Stuart Elementary construction site at crews constructing foundation footings and stem walls, plumbers installing plumbing and electricians laying electrical circuitry.
Looking southwest at crews constructing foundation stem walls.
Looking west at crews constructing foundation forms along the southern portion of the replacement Mt. Stuart Elementary.
Looking to the southeast at crews preparing the foundation stem walls in the forefront and foundation footings in the background.
Looking to the southeast at crews constructing foundation stem walls on foundation footings at the replacement Mt. Stuart Elementary school.
Looking northwest toward the Nature Park at framing of stem walls.
Looking west at crews pumping concrete into the foundation forms.
Looking east at crews constructing foundation forms. The forms in this area are six feet wide to support the weight of the two story portion of the school, where the gym will be located.
Looking northwest at crews forming foundation stem walls atop the recently poured foundation footings.
Looking south at foundation footings as well as the forming of foundation stem walls.
Looking southeast at the replacement Mt. Stuart Elementary foundation footings and forming of foundation stem walls.
Looking southwest at the replacement Mt. Stuart Elementary foundation footings and forming of foundation stem walls.
The forming of foundation stem walls atop completed foundation footings at the replacement Mt. Stuart Elementary.
Looking south at the Palouse to Cascade Trail where crews cleared vegetation and raised the grade to meet the trail.
Construction of foundation stem walls along the north central portion of the replacement Mt. Stuart Elementary.
Looking southwest at crews forming foundation stem walls.
Looking northwest toward the Nature Park at crews forming the foundation footings and stem walls.
Looking south at foundation stem wall forms.
Looking southeast toward Mt. Stuart Elementary at the replacement school site.
Looking south from the future Cora Street extension at the Palouse to Cascades Trail with signage.
Crews at the replacement Mt. Stuart Elementary performing the final footing placement pour.
Construction Progress — August, 2020
Looking to the northwest toward the Nature Park at Mt. Stuart Elementary. Within the forms is freshly poured concrete as well as rebar used for the forming of stem walls, which will be the next step in the construction of the foundation.
Looking to the west toward the Nature Park at Mt. Stuart Elementary. Within the forms is freshly poured concrete as well as rebar used for the forming of stem walls, which will be the next step in the construction of the foundation.
Looking south at vapor barrier coated stem walls at the replacement Mt. Stuart Elementary.
Crews forming stem walls at the southeast portion of the building.
Looking along the west edge of the building toward the south at the backfilled foundation footings and rebar for stem walls.
Looking east at structural steel for the gym rafters waiting to be placed after the completion of the stem walls for the gym portion of the building.
Looking west toward the Nature Park.
Looking south toward Mt. Stuart at crews prepping portions of the building for the pad and crane in the background prepping for erecting structural steel.
Looking west toward the first pieces of structural steel being erected for what will be the kitchen and gym areas.
Crews placing structural steel for the gym at Mt. Stuart Elementary.
Structural steel of the gym
Structural steel of the gym
Looking south toward the structural steel being placed for the gym and kitchen portions of the new Mt. Stuart Elementary.
Kitchen and gym structural steel
Crews pouring concrete for stem walls.
Structural steel for the gym
Crews attaching steel rafters in the gym
Crews laying electrical conduit.
Gym structural steel
Construction Progress — September, 2020
Looking to the south at the new gym at the replacement Mt. Stuart Elementary.
Looking to the southwest at crews working to install pan decking, the first layer of the roof, to the kitchen area at the replacement Mt. Stuart Elementary.
Looking to the west at the structural steel of the gym at the replacement Mt. Stuart Elementary.
Looking to the north at crews installing framing for stem walls.
Looking to the south at crews prepping for a concrete pour of slab.
Looking to the east at stem wall forms in the foreground and structural steel of the gym and administrative offices in the background at the replacement Mt. Stuart Elementary.
Looking at the gym and surrounding areas as crews install pan decking, the first layer of the roof, at the replacement Mt. Stuart Elementary.
Looking to the north at the future kitchen and gym at the replacement Mt. Stuart Elementary.
Looking to the southwest at crews working to install vapor barrier in preparation for the concrete pour of the next slab at the replacement Mt. Stuart Elementary.
Looking to the southeast at crews working to install vapor barrier in preparation for the concrete pour of the next slab.
Looking at the gym where pan decking installation is nearing completion.
Looking to the east at crews continuing the installation of pan decking to the gym and surrounding areas at the replacement Mt. Stuart Elementary.
Looking to the southeast at the replacement Mt. Stuart Elementary.
Looking to the south at crews continuing to install structural steel. In the foreground the vapor barrier and rebar are in place for the concrete pour of the next slab.
Looking to the east at crews installing structural steel.
View from the north at crews placing rebar in preparation for concrete pour of foundation slabs of the east and northeast portions of the building.
Looking north at structural steel lined up to the east of the new Mt. Stuart Elementary building.
Crews placing structural steel to the front entrance.
View from the north at crews preparing the north wing of the replacement Mt. Stuart Elementary for concrete slab installation.
Crews installing rebar in preparation for the concrete slab installation to the north wing of the replacement Mt. Stuart Elementary.
Crews cutting in control joints in concrete, which help control where cracking may occur due to shrinkage.
Crews treating recently poured concrete slab of the east side, or front, of the replacement Mt. Stuart Elementary. The north side is prepared and ready for the next slab pour.
Crews working the concrete and smoothing the slab located at the north wing of the new Mt. Stuart Elementary.
Crews working the concrete and smoothing the slab located at the north wing of the new Mt. Stuart Elementary.
View from the north with the future Early Learning Center in the background.
View from the southwest at structural steel of the south wing and gym in the background.
Crews placing structural steel of the eastern portion of the new building.
Crews placing structural steel of the eastern portion of the new building.
Crews placing structural steel of the eastern portion of the new building.
Crews installing walls of the restroom area of the northern portion of the new building as well as preparing the western wing for the concrete slab installation.
View from within the courtyard to the concrete masonry unit (CMU) structure where the restrooms will be located outside of the gym of the new building.
View from the north wing toward the east wing at structural steel comprising the administrative offices, main entrance, and library of the new building.
View of the gym from the southwest.
Crews placing structural steel of the northern portion of the new building.
October - December, 2020
Construction Progress — October, 2020
View from within the courtyard toward the northwest corner of the replacement Mt. Stuart Elementary with the Nature Park in the background.
View from the courtyard toward the library, restrooms, platform area, and gym.
View from the north as crews continue the installation of pan decking, the first layer of the roofing system.
Pan decking stacked, ready for installation on the roof.
View from the south wing toward the east wing where the administrative offices and library will reside.
View of the gym from the west.
View from the kitchen across the gym toward the administrative wing. Cora Street is to the right.
View from the northeast corner of the new building.
View from the courtyard toward the east wing and gym.
View from within the east wing toward the gym. The front entrance and administrative offices are to the left, library is to the right.
View from the north along the east wing of the new building. The existing Mt. Stuart gym is in the background.
View of the northwest corner of the replacement Mt. Stuart Elementary with the Nature Park to the right.
View from west to east of the north wing.
View from within the gym toward the kitchen area with the existing Mt. Stuart Elementary in the background. The floor of the gym is in the process of being prepped for the concrete slab installation.
View from kitchen area into gym.
View from the east at the distance between the existing Mt. Stuart Elementary and the new building.
View of crews installing structural steel along the west wing of the replacement Mt. Stuart Elementary.
View from southwest toward the courtyard.
View from north to south of the west wing with the existing Mt. Stuart Elementary and the future Early Learning Center in the background.
View from the southwest.
View from the southwest toward the north at crews installing structural steel to the west wing of the replacement Mt. Stuart Elementary with the Nature Park in the background.
View of the south wing where crews are prepping the area for the concrete slab installation.
View from the north.
View from within the courtyard toward the southeast and the gym.
View from the northeast toward the front entrance.
View from within the courtyard toward the northeast corner.
View along the north wing.
View of the north wing.
View looking east toward the front of the school along Cora Street.
Installation of the wall framing along the north wing.
The beginning of the fire suppression system installation started within the east wing.
The beginning of the fire suppression system installation started within the east wing.
Looking west from within the courtyard.
Looking south toward the existing Mt. Stuart Elementary from within the courtyard.
View of the gym with the area where the platform will be located in preparation for installation. The platform is the raised portion of the flooring.
Exterior wall framing along the north wing.
Crews installing fire suppression system within the replacement Mt. Stuart Elementary.
View within the north and west wings with the Nature Park in the background.
View from north to south along the west wing with the existing Mt. Stuart Elementary in the background.
Crews working to install fire suppression systems.
Looking from west to east along the south wing.
Construction Progress — November, 2020
View of wall framing being installed at the replacement Mt. Stuart Elementary.
View of wall framing being installed at the replacement Mt. Stuart Elementary.
View of interior wall framing as well as fire suppression installation.
View from behind the future platform. The platform will be raised above the floor level and is located at the end of the gym.
View of interior wall framing as well as fire suppression installation.
View of the south wing looking east to west. In the foreground the area is being prepped for the concrete slab installation.
View from the northeast.
View from the northeast corner looking southwest with the Nature Park in the background.
View from the northeast corner toward the west with the Nature Park in the background.
View within at wall framing being installed at the replacement Mt. Stuart Elementary.
View of wall framing and fire suppression being installed at the replacement Mt. Stuart Elementary.
View of wall framing and fire suppression being installed.
View of wall framing and fire suppression being installed at the replacement Mt. Stuart Elementary.
View of wall framing and fire suppression being installed.
View from the north side of the courtyard at the replacement Mt. Stuart Elementary.
View from the northeast corner of the courtyard looking to the southwest corner at the replacement Mt. Stuart Elementary.
View from the northwest corner looking east.
View from the northwest corner of the replacement Mt. Stuart Elementary looking south toward the annex, which will be the future Early Learning Center.
View from within the southwest wing of the replacement Mt. Stuart Elementary looking across the breezeway toward the hallway outside of the gym to the east.
Crews prepare the slab of the mechanical room for concrete pour.
View from the south of the courtyard with the Nature Park in the background.
View from within the courtyard looking across to the east toward the front of the replacement Mt. Stuart Elementary.
View of interior wall framing and fire suppression installation.
View of materials stacked awaiting installation at the replacement Mt. Stuart Elementary.
View from the northeast corner at the exterior sheathing being installed at the replacement Mt. Stuart Elementary.
View within the replacement Mt. Stuart Elementary as crews install wall framing and exterior wall sheathing.
The platform at the Mt. Stuart Elementary from the rear.
View of the courtyard from the west wing.
View from the southwest corner of the courtyard to the northwest corner at the Mt. Stuart Elementary.
Looking from the northeast corner as crews install roof flashing and exterior sheathing with the Nature Park in the background.
The platform at the Mt. Stuart Elementary from the front prepped and ready for the concrete pour.
The platform at the Mt. Stuart Elementary from the front prepped and ready for the concrete pour.
Press play to view video
Press play to view video
Construction Progress — December, 2020
Mt. Stuart hallway
View from southeast of the replacement Mt. Stuart toward the west. The painted beam with "Local 14" is the final structural steel beam placed by Garco Construction and is the entrance to the courtyard from outside of the school.
View from the entrance to the courtyard toward the west side of the gym.
View from within the south wing of the replacement Mt. Stuart Elementary.
View from within courtyard at crews installing the various layers of roofing materials.
View of the gym portion of the replacement Mt. Stuart Elementary as crews install windows from the front entrance. The existing Mt. Stuart Elementary is in the background.
View from within the courtyard as crews install roofing material layers.
Door frame installation.
View of the north side of the replacement Mt. Stuart Elementary, Nature Park in the background.
View from the northeast at crews installing roofing materials.
View from inside the courtyard.
Windows installed along the corredor to the gym/commons of the replacement Mt. Stuart Elementary.
View of the gym entrance from the west.
Crews install roofing materials to the north wing of the replacement Mt. Stuart Elementary.
View of the west wing.
Northwest corner of the new Mt. Stuart Elementary. There will be a pathway leading from the door to the Nature Park located to the west.
View of the east site/front of the gym.
View from the northeast corner of the north wing as crews install windows and roofing materials. The Nature Park is in the background.
North wing.
Crews installing of drywall.
Crews installing drywall.
View of the courtyard from the outside entrance.
Crews installing drywall.
Crews install mechanical equipment to the deck above the bathrooms outside of the gym.
Crews installing electrical and HVAC.
Reinforcement backing installed along key locations where cabinetry and other items will be hung on the walls.
Crews install mechanical equipment to the deck above the bathrooms outside of the gym.
Crews install mechanical equipment to the deck above the bathrooms outside of the gym.
January - March, 2021
Construction Progress — January, 2021
Crews install backing along interior walls.
HVAC equipment installation.
HVAC duct materials awaiting installation.
Installation of hat channel used to fur out for siding.
Installation of hat channel used to fur out for siding.
View of mechanical equipment during installation. The exterior sheathing is receiving weather barrier protection.
Interior wall insulation installation.
Crews continue installation of backing, gypsum board, and windows in the area where administration will be at the replacement Mt. Stuart Elementary.
Mechanical equipment located above the restrooms outside of the gym.
Installation of hat channel used to fur out for siding.
Interior wall insulation installation.
Crews begin the installation of the concrete mason unit (CMU) exterior.
Installation of HVAC equipment.
Installation of HVAC equipment.
Crews install windows throughout.
Insulation is installed in both the interior and the exterior walls throughout.
Crews continue installation of systems.
Insulation is installed in both the interior and the exterior walls throughout.
Crews install drywall.
Crews install drywall.
Crews begin installation of masonry veneer to the lower portion of the replacement Mt. Stuart Elementary.
Crews install masonry veneer to the lower portion of the replacement Mt. Stuart Elementary.
Crews install masonry veneer to the lower portion of the replacement Mt. Stuart Elementary.
View from within the courtyard as crews continue installation of roofing materials.
View into the library.
View of the front, which faces Cora Street, as crews finalize the installation of hat channel.
Construction Progress — February, 2021
Crews continue installation of insulation and drywall.
Crews continue installation of insulation and drywall.
Crews mud and tape the drywall of the library.
View of the framing in the corridor alongside the gym. the plumbing is wrapped in insulation along the ceiling.
Crews begin installation of tongue and groove cement board siding.
Crews continue installation of insulation and drywall.
Crews install mud and tape to the drywall along the corridors, offices, and classrooms.
Crews begin installation of tongue and groove cement board siding.
View of new replacement Mt. Stuart Elementary from Cora Street. From left to right: kitchen, gym, and the main entrance.
View form the front of the building toward the main entrance and administrative offices.
Top down drywall installation nears completion, along with backing for cabinetry and heavier items which will be placed onto the walls.
View of one of the design features located in the breakout spaces throughout the building. A benchlike seat will be placed below.
View of the replacement Mt. Stuart Elementary from the northeast corner viewing to the south.
Painting has begun!
Crews install structure for the operable wall located within the gym/commons at the replacement Mt. Stuart Elementary.
Crews continue the installation of drywall to the mechanical areas.
Crews continue the installation of cement board vertical tongue and groove siding.
View from the east at the gym.
Crews install operable wall to gym/commons.
View of one of the design features located in the breakout spaces throughout the building. A benchlike seat will be placed below.
View of the gym/commons from the west.
Construction Progress — March, 2021
Drywall installation continues along with the installation of doorway framing
Mudding and taping of drywall
Crews continue the installation of cement board siding along the courtyard
View of the back of the gym as crews install cement board siding
Crews prime the wall and paint the doorway frames
View from the south at the west wing with the Nature Park in the background as crews install cement board siding
View along hallway at drywall installation. Bathrooms located to the left.
Crews install HVAC ductwork
Crews install metal flashing along the roofline on the south side of the new Mt. Stuart Elementary school
View from within the courtyard as crews install cement board siding
View of one of the break out spaces. A bench seat will be located below the detail.
Decorative metal wall panels
View from within the courtyard toward the front of the school. When the plastic is removed, people will be able to see clear through from the outside to the courtyard. Access to the library is along the left.
View of one of the break out spaces. A bench seat will be located below the detail.
View from within the courtyard; the library is to the left.
View of one of the break out spaces. A bench seat will be located below the detail.
Crews install the hood in the kitchen area
Crews install the hood in the kitchen area
Crews install the walk-in cooler/freezer in the kitchen area
Crews install the drop ceiling grids
View along the corridor outside of the gym
View of the framing along the platform
Crews install the hoods within the kitchen area
Roof access ladder
View from within the office area toward the main entrance
View toward the back of the platform at the main entrance
Within the courtyard
View of the breezeway toward the existing Mt. Stuart Elementary
Reception desk in preparation for installation
Crews install tile throughout the bathroom and custodial areas
Casework within a kindergarten classroom
Crews install the rollup door to the kitchen area
Crews painting the exterior of the new Mt. Stuart Elementary
Crews continue the installation of cement board siding along the north side of the school with the Nature Park in the background
Casework within the autism suite